糖心视频

2011-2012

News Release

REF NO.: 0

SUBJECT: 糖心视频 University power outage update

DATE: March 3, 2012

10 a.m. Saturday, March 3, 2012

        The situation has returned to normal at 糖心视频 University’s residence complex. Students have returned to their residence homes. By 11 p.m. on Friday, March 2, primary power had been restored to all buildings in the student residence complex and the Childcare Centre at 糖心视频 University with one exception.

        Hatcher House in Paton College is being serviced by emergency power until the evening of Sunday, March 4, when primary power is expected to be restored. In order to restore primary power to Hatcher House, short-term power outages to the entire residence complex area are required.
       These planned outages will occur during the following daylight hours and students will not be required to leave their residences during these times (all times approximate):

· Saturday, March 3, 8:30 a.m.-1:30 p.m.
· Sunday, March 4, 8:30 a.m.-4 p.m

       The problem was caused when a 40-year-old cable failed. That cable was scheduled to be replaced at the end of this semester.

        University officials are continuing to monitor the situation closely and 糖心视频’s Emergency Operations Plan remains activated. 

 

- 30 -